Restaurants · Made to order
Restaurant furniture made to order: chairs, tables and banquettes
Ratahome, a sourcing team in Foshan, China, has restaurant chairs, tables and banquettes made to order from your seating plan. Fabrics, leathers, woods and finishes are shown to you on photo and video before the quote, and production takes 3–5 weeks after drawings and samples are approved. Finished pieces and packing are filmed before anything ships; shipping takes about 25–35 days.

- 3–5 weeksProduction, after drawings and samples are approved
- 25–35 daysShipping, after the packing is filmed
- Whole venuesChairs, tables and banquettes in one order
- 12 hoursOur reply time to a new enquiry
01 · Your service brief
What should a restaurant send before ordering furniture?
Your seating plan with the number of covers, the furniture you have in mind and a short description of a normal service day.
The mood board shows the look; the service day shows what the furniture has to survive.
| Think about | Ask yourself | Tell us |
|---|---|---|
| Service style | Quick meals, long dinners or lounge seating? | The comfort you need, and whether chair arms must slide under the table. |
| Covers and layout | How many seats, and where? | A floor plan with covers, aisles and any seating along walls. |
| Moving and cleaning | Do staff stack chairs or move them on trolleys? | How chairs are handled, and whether floor glides must be replaceable. |
| Spills | Which food, drinks and cleaners touch the furniture? | Your cleaning routine and the products you use. |
| Changing the layout | Will you join tables for groups or events? | The heights, bases and storage that must work together. |
We reply within 12 hours with what is clear, what is missing and the next step. A restaurant inside a hotel or a larger fit-out follows the route of our commercial projects.
02 · Chair and table fit
How do you make sure restaurant chairs fit the tables?
Approve them as a pair: the chair has to clear the top, frame and base of the table it will be pulled up to.
Catalogue dimensions do not show every clash: arms can hit the underside of the top, knees a pedestal base. Your options are photographed and filmed before the quote, so check the clearance on those videos and drawings before you approve either piece.
Start from our dining chairs and dining tables, or send a photo of a design you want. Check bar stools against the finished counter, including its footrest.
- Arms: clear the underside of the top when the chair is pushed in.
- Knees and feet: clear the table legs or pedestal base.
- Levelling: each table can be levelled on your floor.
- Stools: seat and footrest suit the finished counter, not only the drawing.


In the United States, the Access Board’s ADA standards cover accessible dining surfaces and knee and toe clearance. Your designer checks the aisles and accessible seating for your building.
03 · Materials and cleaning
Which restaurant furniture finishes are easy to clean?
The ones you have tested with your own cleaning routine on the exact fabric, leather, wood and finish samples, not a label such as “performance fabric”.
Ask for the exact material, what sits under the surface, the finish and its care instructions. Where a physical sample is needed, the sample fee is credited against your production order. Try your own cleaner on it and note the result; this does not replace any laboratory tests your project requires. Then check where wear shows first:
Tabletops
Edges, joints and underside fixings, not only the middle of a new top.
Upholstery
Seams that collect crumbs, and whether covers or seat pads come off.
Frames
Joints, and feet or floor glides that can be replaced.
Mixed materials
One cleaning method that suits the whole piece.


04 · Banquettes and fitted seating
How is a restaurant banquette measured and made?
From the finished room: a banquette is drawn to the wall it runs along, and production starts once you approve that drawing and the upholstery sample.
Length alone is not enough to make one. Have your site team measure the finished walls, including columns and power points. If production must start before the room can be measured, agree in writing what can still be adjusted and who carries the risk. The drawing you approve should settle:
- Shape: seat and back profile, the sections and where the seams fall.
- Base and ends: plinth, end panels and removable access panels.
- Fixing: fixed to the wall or freestanding, and who installs it on site.
- Covers: how an upholstered panel comes off for cleaning or replacement.
05 · How an order runs
How does a restaurant furniture order work with Ratahome?
In six steps, each waiting for your approval: nothing is made, packed or shipped before you have seen it.
- 01
Send your planReply within 12 hours
Seating plan and covers, the pieces you have in mind, photos or links, and a normal service day.
- 02
See the optionsBefore the quote
Chairs, tables, fabrics, leathers, woods and finishes are photographed and filmed for you.
- 03
Approve an itemized quoteLine by line
Each line shows the approved photos, specification, quantity and price. Deposits for furniture start at 10%, by PayPal, credit card or wire transfer.
- 04
Production3–5 weeks
Starts once drawings and samples are approved, with progress on photo and video.
- 05
Checks and packingBefore it ships
Finished pieces are checked against what you approved; pieces and packing are photographed and filmed. Ask to see a batch of chairs side by side.
- 06
Shipping and deliveryAbout 25–35 days
Freight, insurance and customs coordination are included; delivery on site follows the scope on your quote.


Most orders arrive 8–12 weeks after the first brief, 8–10 weeks on average. Tell us before packing whether tables should travel assembled or with tops and bases separate. Import duties and taxes depend on your country and goods; the quote states how they are handled.
Evidence · Delivered projects
Projects delivered with the same photo and video approvals
California, USACustom kitchen, delivered and installedFloor-plan review, material approval, trial assembly, delivery and installation.
New York, USACream kitchen and arched wardrobeRemote design review, video approvals, factory pre-assembly and QC.
AustraliaA whole home, as one projectCabinetry and furniture designed in Foshan and delivered together.
Straight answers · Limits
What we don’t do
- We are not a manufacturer. Selected partner workshops in Foshan make the furniture; we coordinate the order and check it.
- We do not certify fire performance, strength or durability. Your project adviser defines the evidence your venue needs.
- We do not quote before the scope is clear. Every quote is itemized from your plan and the options you approved.
- We do not ship pieces you have not seen. Finished pieces and packing are shown to you first.
Questions
Questions buyers ask us
01How long does restaurant furniture from China take?
8–12 weeks from the first brief with Ratahome, 8–10 weeks on average: 3–5 weeks of production after drawings and samples are approved, then about 25–35 days of shipping.
02Is there a minimum order for restaurant chairs?
There is no fixed minimum. Orders are quoted line by line; small replacement orders are reviewed against quantity, destination and delivery scope before quoting.
03Can I see the chairs before they ship?
Yes. Finished pieces are checked against what you approved, and the pieces and their packing are photographed and filmed for you before anything ships.
04Can indoor restaurant chairs go on a covered terrace?
Not automatically. A roof can still let in humidity, wind-driven rain, sun or salt air. Describe the real exposure so the materials and construction are chosen for it.
05Can I reorder matching chairs later?
Yes. Each line of your Ratahome quote keeps the approved photos and specification to match. If a fabric or finish is no longer available, the replacement is shown to you on photo first.
Sources and how we checked them
These US references are starting points for planning, not a compliance review. Your designer or project adviser confirms what applies to your venue and country.
- U.S. Access Board — ADA Accessibility Standards — Sections 902, 305 and 306 cover accessible dining surfaces and the clearances around them.
- CPSC — Upholstered Furniture — US guidance on upholstered furniture; check the product scope with your adviser.
Next step
Send us your seating plan.
A floor plan with covers, or a few photos of chairs and tables you like, is enough to start. We reply within 12 hours with the next step.
Send your seating plan