Skip to content
Send Requirements
Menu
Craftsman shaping solid wood in a Foshan workshop
How It Works

From Your Plans to Production and Delivery.

Five documented stages. Every decision approved before production begins, every piece inspected before it ships — with one point of communication throughout.

Typically 8–12 weeks Documented milestones No site visit required
01 First reply · 12 hours

Share Your Plans

Floor plan, cabinetry drawings, furniture list or reference images — one file is enough to begin. We turn what you send into a structured project brief.

What you receive
A complete project brief, room by room
What is clear, what is missing and the next step
One dedicated project manager assigned
Consultation with international clients
Client design review
Design development with material samples
Drawings and material samples
02 1–2 weeks

Build the Scope

Confirm cabinetry, rooms, furniture selections and project requirements. Products and materials are matched across Foshan’s manufacturing network — with physical samples shipped before you commit.

What you receive
Room-by-room scope and product matching
Fabric, finish and material samples by courier
Preliminary quotation by project scope
03 Before production

Confirm

Review dimensions, specifications, materials, drawings and quotation. Nothing enters production until the drawings and the final quotation are confirmed in writing.

What you receive
Shop drawings for sign-off before production
Specifications and materials confirmed in writing
Final quotation confirmed in writing
Hand-shaping a solid wood component
Solid wood joinery
Shop drawing review before production
Shop drawing review
Inspecting upholstered chairs before shipment
Seating inspection
Frame inspection against drawings
Frame check vs drawings
04 3–5 weeks

Produce & Inspect

Production coordination, progress updates and pre-shipment QC. Frame, foam, stitching and finish are checked against the approved specification — piece by piece — and photographed before anything is packed.

What you receive
A documented pre-shipment inspection report
Photo and video sign-off, piece by piece
Nothing ships until you approve
05 About 25–35 days

Pack & Coordinate Delivery

Export packing, consolidation where practical and international delivery support — coordinated by the same team, with installation support where available depending on location.

What you receive
Export-grade crating and packing lists
Shipping and customs coordination
Installation support where available, depending on location
Export crates arriving on site
Export crating on site
Installation team assembling furniture
On-site installation
Transparency

Documented at every milestone.

Cross-border sourcing works when nothing is left to trust alone — each stage produces a document you sign off.

Project Brief
Scope, rooms and budget confirmed before design begins.
Shop Drawings
Dimensions and materials signed off before production.
QC Reports
Photographed inspection of every piece before packing.
Packing Lists
Every crate documented for customs and installation.
Complete villa project
Step 01 Starts Today

Send your floor plan — the journey starts there.

One file is enough. We review the scope and clarify the next steps before preparing a quote, with a first reply within 12 hours.