From choosing furniture to receiving it

How to Buy Furniture from China

You have found furniture you like. What should happen before you pay, and how do you know what will arrive? Work through the quote, samples, checks and shipping with a clear picture of the whole order.

Before placing the order

What are you agreeing to buy—and who gets it to you?

The order should say what will be made, what the price includes, when payments are due and who handles inspection and delivery. It also needs an agreed sample or specification, plus a way to deal with changes and goods that do not match.

Suppose two suppliers quote a similar dining chair, but only one includes export packing. Choosing the lower number before checking those details would not tell you which offer costs less to get home.

If you are still deciding where to shop, start with the China furniture market map or the Foshan visit-planning guide. This page picks up when you are ready to turn a shortlist into an order.

The buying process

Seven steps from a shopping list to a shipment

One dated item list keeps the order understandable. If a chat changes a size, finish, quantity or deadline, that change belongs in the list too—with the right person’s approval.

  1. 01

    Write the shopping list

    A bill of quantities (BOQ) lists your pieces and quantities. Add sizes, materials, destination, budget and the date you need them.

  2. 02

    Check the seller and maker

    Find out who will sell, manufacture and export each item, and whether they can handle your specific order.

  3. 03

    Compare like with like

    The same product details, packing, currency and delivery terms make two prices meaningfully comparable.

  4. 04

    Agree the sample and drawings

    Keep the approved finish, prototype, drawing or written specification as the reference for what the supplier must make.

  5. 05

    Put the agreement in writing

    Cover the goods, dates, payments, inspection, changes and what happens if something is wrong before production begins.

  6. 06

    Check the work before it ships

    Quality control (QC) may include material, production and finished-goods checks. Record any problems and confirm how they are corrected.

  7. 07

    Bring the shipment together

    Match the approved goods, carton labels, quantities and shipping documents before authorizing collection or loading.

Your item list

What should you send for a useful quote?

A photograph explains the look. The details alongside it explain what you want to buy—and what you expect the price to include.

Start with the piece, quantity and size. Add the construction, materials, finish, upholstery and hardware you want, along with any performance requirements. Packing, destination and the date you need delivery belong in the same request.

You do not need to pretend every detail is decided. “Supplier to propose” tells the seller where you want options; an empty box can invite an assumption you never intended.

For a home, include the room plan, finish choices and access limits. For a hotel or commercial space, add drawings, required product evidence, labels and delivery phases. Custom pieces also need agreed dimensions, allowed variation and someone authorized to approve changes.

Furniture sourcing team reviewing drawings and technical details
A drawing and sample make the conversation more precise than a room photograph alone.

The people behind the order

Who sells it, who makes it and who puts a problem right?

Those may be different companies. Before ordering, you should know who signs the contract, who receives the payment, where your goods will be made and who handles correction or replacement.

  1. The registered company should match the quote, contract, invoice and bank recipient, or any difference needs a clear explanation.
  2. The producer should explain which work it does itself, what it sends elsewhere and where your items will be made.
  3. Relevant samples, current work and inspection records are more useful than a general factory tour. A business licence alone does not prove production capability.
  4. Export experience and references are worth checking in proportion to the size and risk of your purchase.

Use the manufacturer identity and capability checklist before treating a showroom or trading company as the producer.

Price and minimum orders

Why can two similar pieces have very different prices?

They may use different materials—or include different services. Start with the same specification, then compare what it will cost to receive the furniture, not only to buy it at the factory.

MOQ means minimum order quantity. It may apply to each model, finish or fabric, so the number you need must be checked against the version you want.

Quotation fields to compare before selecting a supplier
FieldWhat to make explicitWhy it changes cost
ProductConstruction, material grade, size, finish, upholstery, hardware and accessoriesSimilar-looking pieces can have different frames, surfaces or fittings
MOQPer model, finish, fabric, material batch, supplier and total orderOne-piece availability may not include custom colors or factory pricing
PackingCarton, corner protection, any disassembly, crate or pallet, labels and required testsProtection and packed size affect damage risk and freight cost
Delivery termsNamed delivery place and agreed Incoterms® 2020 ruleThe rule sets out transport tasks, costs and risk; it does not specify the furniture or replace the sale contract
ServicesSamples, drawings, inspection, combining supplier shipments, documents and after-sales helpA service left out of this quote may still need to be paid for elsewhere
The cost to get it to youfurniture + changes + samples + inspection + packing + collection + consolidation + freight + insurance + duties/taxes + destination handling
A hypothetical USD budget—not a quote or typical market price
Budget lineExample amountWho confirms the real figure?
Furniture$10,000Supplier, against the final item schedule
Samples and export packing$700Supplier; check what the goods price already includes
Inspection$300Inspection provider, against scope and location
Origin collection and consolidation$500Coordinator or forwarder
Freight and insurance$1,500Forwarder and insurer, using packed dimensions and route
Destination handling and delivery$600Destination provider; confirm access and unloading
Subtotal before duties and taxes$13,600Add destination duties and taxes once classification and value are confirmed

The figures show how the budget adds up, not what your shipment should cost. Check what is already included so you do not count it twice. This example excludes storage, installation, financing and exceptional handling.

The furniture classification preparation guide explains what your customs broker needs. The wholesale guide looks at mixed orders and minimum quantities.

What else will you pay besides the furniture price?

Ask whether these costs are already included. The answer matters more than the size of the discount.

Part of your orderCosts to ask aboutWho to askWatch for
Making the furnitureFurniture, custom changes, samples, inspection and export packingYour supplier and inspection providerAre you comparing the same design? Is packing already included?
Getting it shippedCollection, combining orders, freight and insuranceYour coordinator, freight forwarder and insurerAre the quoted dimensions for packed goods? Where does the delivery service stop?
Getting it to your doorApplicable duties, taxes, handling and final deliveryYour destination customs adviser and delivery providerDoes the quote cover unloading and access to your property?

Keep in mindWrite “included”, “extra” or “not yet confirmed” beside each cost. A missing price is not the same as a free service.

A cost-checking framework, not a quote or duty calculation. Amounts remain unconfirmed until the responsible provider reviews the actual scope.

Samples and drawings

What will the finished piece be compared with?

Not every piece needs a full prototype. A standard chair may need a fabric and finish sample; a custom sofa may need a physical trial piece. Built-in cabinets usually need detailed production drawings and material samples.

The approval should say which version was accepted, by whom and with what allowed variation. If a render and drawing disagree, both sides need to know which takes priority. A physical finish sample is also more reliable than a colour on a screen.

If something changesA different material, construction, supplier or finish needs a written proposal and your approval before production. That proposal should explain any effect on the price and delivery date.

Contract and payment

What should happen before each payment?

There is no deposit percentage that makes every furniture order safe. The terms depend on the supplier, custom materials, order value and payment method. The agreement should make clear what progress or documents are due at each stage.

A

Before payment

You should know the seller and bank recipient, have the final quote and specification, and understand when the production clock starts.

B

During production

The agreed milestones can refer to approved samples, material readiness, actual production updates and inspection results.

C

Before shipment

Inspection issues, quantities, packing and document drafts need review. Name the person who can authorize the goods to leave.

Unexpected bank details deserve a fresh check. Confirm any change through a contact channel you already know is genuine, rather than only replying to the message announcing it.

Review payment options and responsibilities →
Finished furniture undergoing quality-control inspection
Inspection works when the acceptance criteria were agreed before production.

Quality checks

When is the right time to inspect?

Some details are easier to check before they disappear under a finish or fabric. Depending on the product, inspections may cover materials, work in progress, finished furniture and packing—not only sealed cartons at the end.

  • Is it the right item? Check the model, size, quantity, labels and approved version.
  • Is it made and working as agreed? Look at construction, stability, seams, finish, fittings and function.
  • Does it match the requirements? Compare materials, colour and the product documents required for the destination.
  • Is it ready to travel? Check protection, carton condition, labels, packed dimensions and loading order.
The right size can still be the wrong resultSuppose a console is specified as 1,200 × 400 × 800 mm, with an agreed allowance of ±2 mm. A measurement of 1,199 × 399 × 800 mm meets that allowance. A scratched visible top still needs attention. These are hypothetical dimensions and tolerances, not a furniture standard.

Agree with the inspector which batch is being checked, how pieces will be selected, what counts as a defect and who decides whether it can ship. Looking at furniture is not a substitute for required safety or performance tests.

See Ratahome’s quality-control process →

Packing and shipping

How do pieces from different suppliers travel together?

Consolidation means bringing several suppliers’ goods together for shipment. One person needs to match the items, carton counts and measurements to the order, and resolve shortages before the packing list is finalized.

Wooden export crates and cartons staged in a furniture warehouse
What is in the warehouse?Receiving records should show the pieces, quantities and condition. The packing and loading plan also needs to account for fragile surfaces, weight and the order of unloading.

The paperwork

Documents you may need for the shipment

  • Pro forma invoice or accepted quotation
  • Commercial invoice
  • Detailed packing list
  • Bill of lading or air waybill—the transport document
  • Certificate of origin or product documents when required
  • Inspection, loading and insurance records where applicable

The exact set depends on the furniture, route and destination. Your destination customs authority, licensed broker and carrier should confirm it before shipment.

Wood packaging:When raw-wood pallets, crates or dunnage are used in international trade, check whether ISPM 15 treatment and marking requirements apply. Engineered wood and the furniture product itself are not automatically treated the same as raw-wood packaging.

This page provides purchasing-process guidance, not customs, tax or legal advice. Classification, import eligibility, duties, product standards and documentary requirements must be confirmed for the specific product and destination.

Review shipping and consolidation support →

Buyer questions

Buying furniture from China FAQ

What information should I prepare before requesting quotations?

Send a furniture list with quantities, sizes, preferred materials and finishes, destination and the date you need delivery. Add drawings or reference photos. Tell the supplier which details are fixed and which you would like help choosing; mark anything still undecided.

How are furniture orders from multiple suppliers consolidated?

The suppliers send labelled goods to an agreed warehouse. A coordinator matches the cartons to your orders, checks their condition and dimensions, resolves missing or incorrect items and works with the forwarder on loading and paperwork. Agree who does each part before deliveries begin.

What payment terms are common when buying furniture from China?

They vary by supplier and order; there is no deposit percentage that suits every purchase. Agree the amounts and the conditions for each payment in writing. Verify the company and bank details, and agree what inspection and documents you need before authorising shipment.

What quality checks should happen before shipment?

Compare the finished pieces with your approved sample, drawings and quantities. Check how they look and work, review any required product evidence, and inspect the packing and labels. Record problems and check the corrections before agreeing that the order is ready to load.

Which documents are commonly used for international furniture shipments?

Common documents include a pro forma invoice, commercial invoice, packing list and transport document such as a bill of lading. Certificates of origin, treatment records, insurance or product-specific documents may also be required. The destination broker and authorities should confirm the exact set.

Want to check the details?

Official sources and notes

The budget and measurement examples are hypothetical, not customer results or quotations. Your contract and destination requirements still apply. The U.S. trade references below explain general document concepts; they are not a China export filing checklist.