Contract guide · Made in Foshan
Contract furniture and joinery for developers and builders
Ratahome, a sourcing and project coordination team in Foshan, China, quotes contract joinery and furniture line by line from your BOQ. Kitchens, wardrobes, vanities and loose furniture for every unit go on one itemized order, and a sample or mock-up is approved on photo and video before volume production. Production takes 3–5 weeks, shipping about 25–35 days, and crate labels by unit or floor are agreed on the quote.

- One orderCabinetry and furniture for every unit, from your BOQ
- 3–5 weeksProduction, after the sample or mock-up is approved
- 25–35 daysTypical shipping time from Foshan
- From 50%Deposit for custom cabinetry; furniture from 10%
01 · One order, every unit
Can the joinery and furniture for a whole development go on one order?
Yes. Kitchens, wardrobes, vanities and loose furniture for every unit type go on one Ratahome quote, itemized from your BOQ.
Each BOQ line becomes a quote line with approved photos, specification, quantity and price, and the same item code can follow it from drawing to crate. Undecided items are marked as open, not priced as a guess. Where two packages meet, such as a stone top on a vanity, the shared dimensions and who checks the fit are agreed first.
| Work package | On the quote | Agreed with your site team |
|---|---|---|
| Kitchens | Carcasses, doors, hardware; stone or sintered tops if specified | Wall sizes, appliance and service positions |
| Wardrobes and vanities | Carcasses, doors, fittings; tops if specified | Ceiling heights, plumbing positions |
| Loose furniture | Made to order for each unit type | Quantities per unit type and phase |
| Building work | Not included | Electrical, plumbing, structural work; fitting unless quoted |
See kitchen cabinetry and joinery for what is made to drawings, and builders and developers for multi-unit packages.
02 · Who does what
Who is responsible for what on a contract furniture order?
Your team owns the design intent, site dimensions and budget; partner workshops in Foshan make the goods; Ratahome coordinates drawings, samples, production, checks, packing and shipping.
| Decision | Who handles it | What you keep |
|---|---|---|
| Design intent and fit on site | Your designer and site team | Approved drawings, measured dimensions |
| How each item is made | Partner workshops, to approved samples | Specification and photos per line |
| Coordination, checks, packing, shipping | Ratahome | Photos and video of each stage |
| Budget and changes | Your authorised representative | Written changes to price and dates |
| Import and local approvals | Your importer, broker and advisers | Documents and written advice |
| Receiving and fitting | Your site team or installer, unless quoted | Delivery checks and a faults list |
No role should be left to “someone else”. Ratahome is operated by 佛山市绎间科技有限公司 (Foshan Yijian Technology Co., Ltd.), whose business licence is published; the team has 12 years of sourcing experience in Foshan.
03 · Writing the specification
What should a contract furniture specification include?
The material, construction, intended use and checks for each item, in writing, because “commercial grade” on its own describes none of them.
Material
Board, veneer, solid wood, stone or fabric for each part.
Construction
Joints, edges, hardware and how it is fixed on site.
Intended use
Who uses it, how often, and how it is cleaned.
Evidence
Any required standard and edition, matched to this model.
Cabinetry on a Ratahome order uses ENF-grade boards, PUR edge banding, water-based lacquer and European hardware of the Blum or Hettich class. Test reports are product-specific: the voluntary BIFMA standards treat office chairs, public lounge seating, desks and storage separately, so name the standard and edition and match the report to the quoted model. Mandatory rules depend on product and destination (in the US, composite-wood and upholstered-furniture rules are separate), and a qualified adviser confirms which apply.
04 · Sample and mock-up
Is a sample or mock-up approved before volume production?
Yes. Volume production starts only after the drawings and a sample or mock-up of the repeated items are approved on photo and video.
- 01
Scope and optionsBefore the quote
Items, quantities, exclusions and who signs off; finish options photographed and filmed.
- 02
Drawings and samplesBefore the mock-up
Finishes, connections and any required tests are settled.
- 03
Sample or mock-upOn photo and video
Accepted details recorded, with what the sample does not cover; pieces can be trial-assembled.
- 04
Volume production3–5 weeks
Built to the approved sample, with progress on photo and video.
- 05
Before shipmentBefore loading
Corrections rechecked, packages matched to the BOQ, packing filmed.


A wrong finish caught at the sample stage is one change; caught in a container, it delays every unit. Log later changes: a new finish can move price, lead time and packing. See quality control for what is checked at each stage.
05 · Site programme
How is delivery planned around the site programme?
Backwards from the date each floor or phase can receive goods, allowing 3–5 weeks of production and about 25–35 days of shipping.
Leave time on site for unpacking, fitting and checks in a dry, secure building; a workshop finish date is not an arrival date. For staged handover, decide early whether a full container matters more than receiving one phase at a time.
| Stage | Typical time | What sets it |
|---|---|---|
| Approvals | Typically 1–2 weeks | How fast finishes and site sizes are confirmed; a full mock-up adds time. |
| Production | 3–5 weeks | Counted from the approved drawings and sample. |
| Shipping | About 25–35 days | Port, customs clearance and the site delivery slot. |
| On site | Your programme | Unpacking, fitting, checks and fixing faults. |
06 · Labels and handover
How are goods packed so each unit can be handed over on its own?
By agreeing the labels on the quote: crates can carry the project, unit or floor, item code and piece count, and the packing list follows your BOQ lines.
- A packing list that follows your BOQ lines and units.
- Fixing hardware and spares: agree where they are packed, so fitters find them.
- Instructions and care guidance: ask for them before shipping, with spare-part codes.
- Photos and video of finished pieces and packing before loading.


For residential units, the warranty covers structure, frames and cabinetry carcasses for 3 years and hardware, mechanisms, finishes and upholstery for 2 years, with claims answered within 48 hours; the order confirmation records the terms for each project. Choose spares by item: a hinge or a cover often helps more than a whole spare piece.
Evidence · Delivered projects
Kitchens and whole homes we have delivered from Foshan
Melbourne, AustraliaA whole home in three containersCabinetry, furniture, lighting and rugs coordinated by one team.
AustraliaA whole home, as one projectCabinetry and furniture designed in Foshan and delivered together.
Valencia, SpainCustom kitchen fitted in SpainDesigned remotely, made in Foshan, shipped to Valencia and fitted on site.
Straight answers · Limits
What we don’t do
- We are not a manufacturer. Partner workshops in Foshan make the goods; we coordinate the order and check it.
- We do not do building work. Electrical, plumbing and structural work stay with your site team; fitting is included only where quoted.
- We do not issue compliance approvals. Qualified advisers for your destination confirm which rules apply.
- We do not start volume production before the sample or mock-up is approved.
Questions
Questions buyers ask us
01What is contract furniture?
Furniture and joinery chosen for a business, institutional or multi-unit setting, such as a hotel, an office or a residential development. Use, construction, testing and maintenance matter more than a “commercial grade” label.
02Can Ratahome quote from our BOQ?
Yes. Each BOQ line becomes a quote line with approved photos, specification, quantity and price, and undecided items are marked as open rather than priced as a guess.
03How much deposit does a contract order need?
From 50% for custom cabinetry and from 10% for furniture, by PayPal, credit card or wire transfer (T/T). When the balance is due is agreed in writing before you pay.
04How long does a multi-unit order take?
3–5 weeks of production after the sample or mock-up is approved, then about 25–35 days of shipping. Phased programmes are planned from your site dates.
05Is Ratahome the manufacturer?
No. Ratahome is a sourcing and project coordination team in Foshan, operated by 佛山市绎间科技有限公司. Selected partner workshops make the joinery and furniture; we coordinate samples, production, checks, packing and shipping.
Sources and how we checked them
The external references behind this page. Standards and regulations change: confirm the current edition and the rules for your destination with a qualified adviser.
- BIFMA — Standards descriptions — Voluntary standards, specific to product and use; check the edition your project requires.
- CPSC — Upholstered furniture — US guidance for upholstered furniture in scope.
- EPA — Composite Wood Products Act FAQs — US composite-wood requirements, separate from furniture durability tests.
Next step
Send us your BOQ and unit plans.
A BOQ, unit plans or a furniture schedule is enough to start. We reply within 12 hours with what is clear, what is missing and the next step.
Send your BOQ