Hospitality guide · FF&E and joinery
Hotel furniture and guestroom joinery made in Foshan
Ratahome, a sourcing and project coordination team in Foshan, China, turns a hotel FF&E list or BOQ into one itemized order. Guestroom casegoods, headboards, wardrobes, vanities and lounge and restaurant furniture are quoted line by line, and a mock-up room is approved on photo and video before rooms are repeated. Production takes 3–5 weeks and shipping about 25–35 days, planned back from your opening date.

- One listGuestroom and public-area furniture on one quote
- Mock-up firstApproved on photo and video before rooms are repeated
- 3–5 weeksProduction, after the mock-up and samples are approved
- 25–35 daysTypical shipping time from Foshan
01 · What we quote
What hotel furniture can be made in Foshan?
Guestroom casegoods, headboards, wardrobes and vanities, plus lobby, lounge and restaurant furniture, quoted together from one FF&E list or BOQ.
FF&E means furniture, fixtures and equipment, a broad category rather than a promise that everything is included. Each Ratahome quote line is marked as included, excluded or supplied by others, so it is clear whether mattresses, lighting, mirrors and installation are in the price. Fixed headboards, wardrobes and vanities also need site dimensions and fixing details.
Guestroom casegoods
Beds and headboards, bedside units, desks and dressers, repeated by room type.
Guestroom joinery
Wardrobes, vanities and wall panels, made to site-measured drawings.
Lobby and lounge
Sofas, lounge chairs, coffee and side tables, often one-off pieces.
Restaurant and bar
Dining tables and chairs, bar stools and sideboards.
See hospitality for the guestroom and public-area scope, and joinery for work made to drawings.
02 · From list to quote
How do you get an itemized quote from an FF&E list?
Send the list with room types and quantities; each item becomes a quote line with approved photos, specification, quantity and price.
Guestroom pieces are counted per room type and listed apart from one-off lobby pieces. Give each item one code that follows it from drawing to crate, and date every changed drawing: two files both called “final” leave a workshop guessing.
| Item | How it is counted | Details we need | Approved before production |
|---|---|---|---|
| Bedside unit | Per room × rooms of each type | Left or right hand, drawers, finish, charging cut-outs | Room drawing and sample |
| Guestroom chair | Room allocation; spares listed separately | Size, fabric, frame and cushion construction | Sample and any product checks |
| Lobby sofa | From the lobby layout | Sections, joints, access sizes, covers | Layout, seams and assembly |
| Restaurant table | From the seating layout | Top, edge, base, levelling feet | Table and chair together |
03 · Mock-up room
What is a hotel mock-up room, and what should you check in it?
One representative guestroom, furnished before the order is repeated; once it is approved on photo and video, or in person, every room of that type is made to match.
Try it as a guest and as housekeeping, with the planned mattress, lights and curtains in place, and judge the finishes under the room’s own lighting. Record what was accepted and what still has to change.
- Open every drawer and door and put a suitcase where a guest would.
- Check housekeeping access behind and beneath the furniture.
- Look at edges, handles and seams, and sit in every seat.
- Ask staff to show the cleaning routine on each finish.
- Note which room types and variations the approval covers, such as left- and right-hand rooms.

Keep signed finish samples; a later change of fabric, foam or coating may need another review or test.
04 · Matching every room
How do you know every room will match the approved mock-up?
Every partner workshop builds to the approved mock-up, drawings and finish samples, and finished pieces are checked against the approved sample before packing.
Casegoods, upholstery and joinery can come from different partner workshops. Each gets the same drawings and finish samples, any proposed change of board, fabric or hardware is marked, and Ratahome checks that finishes match across workshops and the item list is complete.
Before checks start, agree which dimensions and defects matter and what happens when a piece fails. Pieces seen together deserve extra attention: paired bedside units, neighbouring upholstery, connecting sofa sections, left- and right-hand versions. A corrected piece is shown to you again on photo or video before it is packed.


05 · Rules to check
Is there a certificate for hotel furniture?
No single one: the destination, product, building use and hotel operator decide what evidence is needed, and a qualified fire or building-code adviser should confirm it before materials are ordered.
For a US project, ask whether the upholstered pieces meet the requirements for smouldering resistance and labelling. The CPSC upholstered-furniture guidance explains which products 16 CFR part 1640 covers; it is not a general fire approval for a hotel. Composite-wood panels are a separate check under TSCA Title VI, explained in the EPA’s composite-wood guidance; confirm what your importer must do.
Each Ratahome quote line names its materials, such as ENF-grade boards and water-based lacquer on cabinetry, for your adviser to check; a board grade is not a certificate.
06 · Packing and delivery
How is hotel furniture packed and delivered around the opening date?
Packed for export on a programme planned back from your opening date, with crates labelled by room type or floor where you need it and a packing list that follows your FF&E list.
When floors open one by one, crates can carry the item code, room type or floor and piece count, so installers can start before everything is unloaded; agree the labels and where fixing hardware, spares and care information are packed on the quote. Check lift sizes, receiving hours and storage early: a sofa section that will not fit the lift should be caught on the drawing.
| Stage | Typical time | What to plan |
|---|---|---|
| Production | 3–5 weeks | Starts after the mock-up, drawings and samples are approved. |
| Shipping | About 25–35 days | Port, customs clearance and the delivery slot at the hotel. |
| Installation | Your programme | Floor by floor, with time to fix faults before opening. |

See commercial projects for hotel programmes, and the contract furniture guide for unit-by-unit handover.
Evidence · Delivered projects
Joinery and furniture we have delivered from Foshan
New York, USACream kitchen and arched wardrobeRemote design review, video approvals, factory pre-assembly and QC.
California, USACustom kitchen, delivered and installedFloor-plan review, material approval, trial assembly, delivery and installation.
Melbourne, AustraliaA whole home in three containersCabinetry, furniture, lighting and rugs coordinated by one team.
Straight answers · Limits
What we don’t do
- We are not a manufacturer. Selected partner workshops in Foshan make the furniture and joinery; we coordinate and check the order.
- We do not issue fire, building-code or accessibility approvals. Qualified advisers for your destination confirm what is required.
- We do not start volume production before the mock-up room, drawings and samples are approved.
- We do not quote import duties or taxes. They depend on your country and goods, and the quote states how they are handled.
Questions
Questions buyers ask us
01Can one supplier in China make all of a hotel’s FF&E?
Some sell the whole package but buy certain items in, so ask who makes each category. Ratahome coordinates selected partner workshops in Foshan and checks that finishes match across them.
02What should I send for a hotel furniture quote?
Your FF&E list or BOQ with room types and quantities, drawings, finishes, the destination, installation phases and the operator’s requirements. Mark undecided items and anything supplied by others.
03Is a mock-up room always necessary?
Not always. It depends on how much repeats and how complex the room is; for custom guestrooms, one approved room catches problems before they are repeated.
04How long does hotel furniture take from China?
3–5 weeks of production after the mock-up, drawings and samples are approved, then about 25–35 days of shipping, planned back from your opening date.
05How much deposit does a hotel order need?
From 10% for furniture and 50% for custom cabinetry such as wardrobes and vanities, by PayPal, credit card or wire transfer. Balance timing is agreed in writing before you pay.
06Does Ratahome manufacture hotel furniture?
No. Ratahome is a sourcing and project coordination team in Foshan with 12 years of sourcing experience, operated by 佛山市绎间科技有限公司. Selected partner workshops make the furniture; we coordinate the FF&E list, mock-up, checks, packing and shipping.
Sources and how we checked them
The external references behind this page. Rules change and depend on the destination: confirm the current requirements for your project with a qualified adviser.
- CPSC — Upholstered furniture — US scope, testing and labelling guidance; not a global hotel approval.
- EPA — Composite Wood Products Act FAQs — US TSCA Title VI information for regulated composite wood and finished goods.
Next step
Send us your FF&E list.
An FF&E list, room drawings or a BOQ is enough to start. We reply within 12 hours with what is clear, what is missing and the next step.
Send your FF&E list