Buying for a hotel

Hotel furniture sourcing in China

Imagine approving a lobby sofa, then discovering its largest section will not fit in the lift. A good hotel furniture order starts with the rooms, the people using them and the route from delivery to installation.

Where should you start with a hotel furniture order?

Make a room-by-room furniture list with quantities, often called a bill of quantities or BOQ. Keep repeated guestroom pieces separate from one-off lobby furniture. Review samples in a working mock-up room, agree the required product checks, and label the delivery so installers can find each piece. Ratahome helps coordinate the buying process; the selected suppliers manufacture the furniture.

Decide what the furniture order includes

A bedside unit may repeat across many rooms; a curved lobby sofa may be made only once. Keep separate lists for guestrooms and public areas so room counts do not accidentally determine lobby quantities.

You will hear suppliers use FF&E: furniture, fixtures and equipment. It is a broad buying category, not a promise that every item is included. Ask: “Does this price include the mattress, lighting, mirrors and installation, or furniture only?”

List each item as included, excluded or supplied by someone else. Fixed headboards and wardrobes also need site dimensions and fixing details. Before asking for prices, decide who will check each part:

  • Hotel operator: how the furniture will be used, cleaned and replaced.
  • Designer: dimensions, finishes and acceptable alternatives.
  • Buyer: quantities and budget.
  • Site team: access, walls and fixing points, storage and installation.

For a hotel with several commercial areas, the contract furniture responsibility matrix helps divide the work.

Build a furniture list you can update without losing track

Use this example worksheet to prepare your own list. It is not a quotation or a completed Ratahome project.

Example hotel furniture list
ItemHow to count itDetails the supplier needsCheck before production
Bedside unitUnits per room × rooms of each typeLeft/right arrangement, drawers, finish, any charging cut-outsRoom drawing and sample
Guestroom chairRoom allocation, with spares listed separatelySize, fabric, frame and cushion constructionPhysical sample and required product checks
Lobby sofaCount from the lobby layoutSections, joints, access sizes and any replaceable coversLayout, seams and assembly
Restaurant tableCount from the seating layoutTop, edge, base, levelling feet and cleaning instructionsTable and chair together

Give each item a code and keep it on the drawing, quotation and packing list. Beside it, record the latest drawing, finish, quantity and delivery phase.

For example, if a room changes from one bedside unit to two, update the room calculation before asking for a new total. Date the changed drawing; two different files both called “final” leave the supplier guessing.

Furniture details being discussed against paper drawings and a tabletop sample
Keep the item code and drawing date beside the sample being discussed.

Ask who will make each kind of furniture

A good sofa sample tells you little about how a supplier makes wardrobes. Ask which workshop produces each category and which work goes to other companies. Several specialist suppliers can work well, but someone must check matching finishes and the complete item list.

Send each supplier the same drawings and materials. Ask them to mark any changes: a different board beneath the finish, another fabric, cheaper hardware, or assembly left out. Otherwise, the lower price may buy a different product.

For guestrooms, ask how the approved sample will be kept for batch comparisons. For curved or custom lobby furniture, ask how the first piece and its joints will be checked. The manufacturer verification guide explains what to check about the company, workshop and product.

Unfinished wooden cabinets arranged in a production workshop
Cabinets and upholstered seating may come from different workshops. Ask who makes each.

Try the sample room as a guest—and as housekeeping

A mock-up is a sample room assembled before the order is repeated. Put the furniture beside the proposed mattress, lights, curtains and wall finishes. Open the drawers, place a suitcase and check whether housekeeping can reach behind and beneath the pieces.

Look at finishes under the planned room lighting, then check edges, handles, seams, seat feel and stability. Ask staff to demonstrate cleaning and routine maintenance. Record the items and dated drawings present, including what is accepted and what still needs changing.

Keep signed finish samples and photographs of agreed details. Changing fabric, foam or coating later may require another review or test. Agree who will decide and by when; an unanswered design question is not a confirmed production instruction.

A chair sample being examined in a furniture workshop
A physical sample review can expose details that a catalogue image cannot show.

Try one room before ordering the rest

A sample room lets you catch awkward details while they are still easy to change.

  1. Use the room

    Open the drawers, sit on the chair and walk around the bed. Can housekeeping reach the areas that need cleaning?

  2. Agree the changes

    Write down what works and what needs fixing. Check whether the same changes also suit other room types.

  3. Save the final design

    Keep the approved drawings, finishes and requirements together so the factory knows exactly what to make.

  4. Compare the finished pieces

    Check later pieces against the approved sample, including matching finishes, drawer operation and any corrections.

Keep in mindIf the factory changes the fabric, foam or construction later, ask what needs to be checked again before accepting the change.

A sample-room check does not replace required safety or compliance evidence. Payment terms are agreed separately.

Check the rules before choosing materials

There is no worldwide “hotel furniture certificate.” The destination, product, building use and hotel operator determine what evidence is needed. Ask your qualified fire or building-code adviser to confirm the requirements before materials are ordered. A report about fabric alone may not cover the required material combination or finished chair.

For a U.S. order, ask your adviser whether the upholstered pieces meet the applicable requirements for resistance to smoldering and labelling. The CPSC upholstered-furniture guidance explains which products are covered by 16 CFR part 1640. It is not a general fire approval for a hotel.

Furniture containing regulated composite-wood panels needs a separate check. The EPA's composite-wood guidance explains TSCA Title VI. Confirm which products it covers and what your importer must do for this order.

Keep a checklist beside the furniture list: item, destination, required standard and edition, supporting report, responsible person and whether the check is complete. Your local design team must also review accessibility. A suitable table alone does not make the room layout compliant.

Check more than the first finished piece

One good chair does not tell you whether the rest of the order matches. Before inspection, agree which dimensions and functions matter, how pieces will be selected, which defects are unacceptable and what happens if a check fails.

Pay attention to pieces seen together: paired bedside units, adjacent upholstery and connecting sofa sections. Check left/right arrangements as well as finishes. Furniture shipped in parts needs assembly instructions and a complete hardware set.

Record each correction against the item code and check it again. Ask for a dated result, not only “fixed.” The China purchasing guide connects these checks with payments and permission to ship.

A furniture surface being measured against an open reference document
Record the measured size beside the agreed drawing. A photograph alone leaves the result unclear.

Help installers find the right pieces on arrival

The most compact container load is not always the easiest order to unpack. If guestrooms open floor by floor, decide how installers will find the first floor’s furniture before everything else is unloaded.

  • Mark cartons with project, item code, room type or zone, piece count and handling information.
  • Keep a packing list that maps every carton to the BOQ and shipment.
  • Confirm loading access, receiving hours, lift sizes, temporary storage and who unpacks.
  • Separate installation hardware, spare parts and care information so they can be found on arrival.
  • Agree how receiving damage and shortages are recorded and reported.

Ask to see the proposed packing for vulnerable tops, projecting legs and large pieces. Confirm who pays for freight, customs clearance, local delivery, installation and packaging disposal.

Ratahome’s project agreement should explain which buying and coordination services are included. Combining furniture into one shipment does not replace specialist compliance advice, customs clearance or a local installation team.

Boxed furniture protected by wooden frames in a warehouse
The carton label should tell the receiving team what is inside and where it belongs.

Buyer questions

Practical questions, answered

Can one China supplier make all hotel FF&E?

Some sell the whole package, but they may buy certain items from other workshops. Ask what they make, what they buy in, and who will check matching finishes and missing items.

What should I send for a hotel furniture quotation?

Send room types, furniture quantities, drawings, finishes, destination and planned installation phases. Include the hotel operator’s requirements. Mark undecided items and anything supplied by someone else so the supplier does not price a guess.

Is a mock-up room always necessary?

It depends on how much furniture repeats and how complex the room is. For custom guestrooms, trying one representative room can reveal problems before they are repeated. Agree which room types and variations that approval covers.

Does Ratahome manufacture hotel furniture?

No. Ratahome helps with sourcing and coordination; selected suppliers make the furniture. The project agreement should name who handles drawings, samples, inspection, shipping and local installation.

Want to check the details?

Official sources and notes

The examples are for planning, not quotations or past client projects. Photos illustrate the subject; they do not prove factory ownership or product certification. Check current requirements and dates with the relevant authority or organiser.

Have a project in mind?

Tell us what you need, where it will be delivered and when you need it. A furniture list or a few reference photos is a useful place to start.

Ratahome helps coordinate suppliers, samples and delivery in Foshan. We work with manufacturers; we do not manufacture the furniture ourselves.

Talk about your project